Paper Bags manufactured by Brivote

Product 08

Paper Bags

A paper bag is the last touchpoint at retail and the first thing seen on the street. Handle type, paper weight and reinforcement decide whether it still looks composed after a day of use.

We produce twisted rope, flat paper and die-cut handle bags in coated, kraft and speciality paper. Bag weight, base board and top turnover are specified together so the bag holds its shape when loaded.

At a glance

Typical minimum
Around 1,000 pcs per style
Sampling
Approx. 7–10 working days
Production
Approx. 20–25 working days
Structures in this category
4 listed styles
Get a quote for Paper Bags

Specification options

What you can specify.

Options below are all produced in-house. The right combination depends on the product, the journey and the budget — we will say when a finish is not worth the cost.

Materials

  • Coated paper 210–250gsm
  • Kraft paper 150–200gsm
  • Speciality paper
  • Recycled paper

Printing

  • Offset CMYK
  • Pantone
  • Flexo

Finishing

  • Matte lamination
  • Foil stamping
  • Embossing
  • Uncoated finish

Insert options

  • Card base board
  • Tissue paper
  • Ribbon

Structure notes

Handle pull strength and base board are checked on the sample, because bags fail at the handle first.

Related projects

How this structure is used.

All projects

FAQ

Paper Bags questions.

Typically around 1,000 pieces per style, depending on the box structure, materials and printing method. Smaller trial runs can sometimes be arranged for new projects after we review the specification.

Yes. Every structure is built to your product dimensions. We review the internal size, board thickness and clearance so the finished box holds your product correctly rather than simply matching the outside measurement.

Yes. A physical sample is produced for approval before production. The sample reflects the approved structure, material and finishes, and production starts only after you confirm it in writing.

Around 20–25 working days after sample approval. The final schedule depends on structure, materials, quantity and the production queue at the time of order confirmation.

Also consider